Skip to main content

In 2024, several mining companies in Kazakhstan resumed operations at significant deposits, submitting project plans through the Unified Environmental Portal.

OralElectroService has returned to the Uzynzhal deposit in the Karaganda region, targeting 500,000 tons of zinc-lead ore annually. The project will use open-pit mining until 2033 before transitioning to underground methods, with total reserves of 12.5 million tons.

In East Kazakhstan, Taskara will mine gold and silver at the Taskora deposit. The three-year project focuses on processing 31,000 tons of ore annually.

In the Zhambyl region, Ushalyk Gold Operating plans to extract 727,000 tons of ore at the Ushalyk deposit over four years, processing up to 250,000 tons annually to produce flotation concentrate.

These initiatives highlight the mining sector’s sustained importance in Kazakhstan’s economy.

The MINEX Forum 

Was founded in 2005 to stimulate international cooperation in the field of sustainable development of mining and metallurgical production in Eurasian countries. Over the years, the MINEX Forum has become one of the most authoritative international events in Europe and Central Asia. The forum’s ecosystem brings together thousands of specialists from hundreds of companies and organisations around the world. 

www.minexforum.com  

Advantix Ltd 

MINEX Forum is organised under International Trademark owned by Advantix Ltd. Founded in the UK in 2002 Advantix specialises in the organisation of international events in the field of international finance, mining & metallurgy, critical raw materials, industrial digitalisation, the transition to low-carbon production, etc. 

www.advantix.com  

MINEX Eurasia 202320222021 |  2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012